Fire Pump Integration

Project Name: Éyameth’ Health Centre Fire Pump Integration
Client: Noria Construction
Project Commencement Date: June 2026
Project Completion Date: July 2026
Project URL: https://eyameth.com/

Golden Ears Fire was contracted by Noria Construction to support the fire protection upgrade at the Éyameth’ Health Centre. Our scope included the full integration of a new fire pump skid unit with the facility’s existing water tank, ensuring reliable flow, pressure performance, and compliance with all applicable fire protection standards.

Scope of Work

– Installation and tie-in of a fire pump skid unit to the established system infrastructure.

– Connection and commissioning of a 10” fire line, ensuring seamless integration with the building’s fire protection network.

– Verification of pump performance, flow requirements, and system pressures.

– Coordination with site teams to ensure efficient scheduling and minimal disruption to overall project progress.

– Final inspection and documentation for turnover.

The upgraded system provides dependable fire suppression capability for the Éyameth’ Health Centre, supporting the safety requirements of a community-focused health facility. The project was completed on schedule and in alignment with the quality and communication standards expected by Noria Construction.

Other Projects